Cart

Product Price Quantity Subtotal  
4-laning Development of Four laning of Jagtial (Design Km.92.700) to Mancherial (Design Km.160.995) of NH-63 40.00
40.00 ×
Repair Ordinary Repairs on Selected stretches from km 1570 km160 5 161 884 169 484 km 190 550 195 050 of NH 87 40.00
40.00 ×
Bridge Construction of High Level Bridge at Km.3/4-3/6 of Ayyaneri-Ramnagar road 30.00
30.00 ×
Painting the sannathis, laying cut stone flooring, construction of compound wall of Arulmigu Agatheeswarar temple Re-Construction Sri Lakshmi Chennakesava Temple, Lingala 30.00
30.00 ×

Cart totals

Subtotal 140.00
Total 140.00