Cart

Product Price Quantity Subtotal  
Repair Work of permanent FDR from km 468/000 to 470/000 Devaliya Rajpipla section of NH56 40.00
40.00 ×
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Construction of Balance Work of Bypass around Gumla town connecting NH-78 and NH-23 40.00
40.00 ×
Repair Restoration and repair from Km 40.3000 to Km 42.000 of NH306 40.00
40.00 ×
Building Interior work of Netaji Interpretation Center at Jail road, Cuttack, Odisha 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 One Time Improvement from Km 56.140 to 102.920 and Km 17.605 to 40.905 of NH-158 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 40.00
40.00 ×
Construction of Public Toilet at Shanmuga School Adjoining (14 seats) - Ward.No.29 in Tiruvannamalai Municipality Construction of 06 Nos of New Toilet Blocks and Repairing 14 Nos of existing Toilet Blocks on Km 28000 to Km121000 of NH32 40.00
40.00 ×
Maintenance works Routine Operation and Maintenance of Delhi-Gurgaon section of NH-48 40.00
40.00 ×

Cart totals

Subtotal 320.00
Total 320.00