Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvement to road Tumkur Honnavara Road to join Tiptur Hassan road via Gowdanakatte Shivara road from ch 3.50 to 5.00 km 40.00
40.00 ×
Flyover Design and Construction of Flyover at Garha Tiraha Section at Ch. 150.350 Design Ch. 150.566 Jhansi Khajuraho project NH 39 PackageII 40.00
40.00 ×
road Construction Of NH 353 J stretch from chandur bazar naka to junction with NH548C 40.00
40.00 ×

Cart totals

Subtotal 120.00
Total 120.00