Cart

Product Price Quantity Subtotal  
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Road Tunnel with its approaches from Shiv Murti Interchange on NH248BB/NH48 to Nelson Mandela Marg (NH-148AE) 30.00
30.00 ×
road Construction Of NH353 J Stretch from Chandur bazarNaka to Junctionwith NH 548 C 40.00
40.00 ×
Repair URGENT REPAIR AND MAINTENANCE OF REWARI INTERNAL ROAD 40.00
40.00 ×
road Short Term Maintenance work between km. 0.0 to 43.200 Porbandar - Bhanvad - Charpatiya road of NH 151 K 40.00
40.00 ×
4-laning Access Controlled Highway of 4 Lane with Paved Shoulders from design Ch. 26.000 to design Ch 55.800(Package 2) 40.00
40.00 ×

Cart totals

Subtotal 190.00
Total 190.00