Cart

Product Price Quantity Subtotal  
8 Lane Rehabilitation and Up gradation from 4 to 8 laning of NH-53 from Km.0.00 to Km.18.00-Package-1 30.00
30.00 ×
blackspot Rectification of 10 nos. Black Spots of NH 512 Kadighat and Kalitala , Gangarampur BusStand 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
Repair Repair and Painting Work of Plan House, Control Room and Old Barrack at Siul Complex, BSPS, Surangani 40.00
40.00 ×
Construction of Service roads at Mangalampalam, Panniyankara, Kodakara and Potta in the stretch of Walayar-Angamali Section of NH-544 Construction of Service Road from Ch 2.800 to Ch 4.200 of NH69 30.00
30.00 ×
Construction of 7 nos. of FOB at Km.378.620 Km.380.080, Km.395.330, Km.417.070, Km.420.320, Km.423.210 and Km.431.640 on Aligarh - Kanpur Section of NH-34 Construction of Foot Over Bridge at Km.75086 (Thiruvachi) on Kumarapalayam to Chengapalli section of NH-544 30.00
30.00 ×
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of 02 (two) no. RCC Bridges at Villages Nilpur, Sarpai (Bhajachauli), Block Contai III and P.S. Marishda 40.00
40.00 ×

Cart totals

Subtotal 240.00
Total 240.00