|
Construction of High level Golpahari bridge at km 40.766 with approaches (Design Chainage from km 39.700 to km 41.500) on NH-419 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of Chintamani Bypass on NH 69 |
₹40.00 |
|
₹40.00 |
× |
|
Operation and Maintenance of four lane with paved shoulder Bhopal-Biaora section from km 315.725 to km 324.000 Pkg-I of NH46 |
₹40.00 |
|
₹40.00 |
× |
|
STMC of NH 51 from km 145.000 to km 148.282 (L 3.282 km) under NH cum Tura Central Division |
₹40.00 |
|
₹40.00 |
× |
|