Cart

Product Price Quantity Subtotal  
Bridge RECONSTRUCTION OF MAJOR BRIDGE AT LHS OF KM. 79.520 (EXISTING) WIDTH OF STRUCTURE INCLUDING CRASH BARRIER 12.5 M SECTION OF NH 44 40.00
40.00 ×
road Construction Of NH 353 J stretch from chandur bazar naka to junction with NH548C 40.00
40.00 ×
Widening Improvement and Widening to Two Lane with paved shoulder of road from Km 101.300 to km 127.319 (Total Length 26.019 Km) i.e. the Khowai - Teliamura section of NH 208 30.00
30.00 ×
Repair and rehabilitaiton of Bridges of Purnea -Dalkhola section of NH -27 Rehabilitation and Strengthening of 63.75m span steel bridge on NH107 30.00
30.00 ×

Cart totals

Subtotal 140.00
Total 140.00