Cart

Product Price Quantity Subtotal  
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Flyover at chainage Km 165.200(Pastikudi) on NH-26 40.00
40.00 ×
Widening Widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design ch from 0.000 to 51.000 on RKCTC NH(701) 40.00
40.00 ×
Bridge Construction of ROB at Km-209 of NH-114A near Jagdishpur (LC No. 5 of B of E) 40.00
40.00 ×
Construction of balance concrete road connecting to North Gate flyover in JNPA CONCRETING TO NANDGAON AMBHERPADA ROAD VR-247 TAL. KARJAT 40.00
40.00 ×
Maintenance works Short Term Maintenance of NH -12 (Add.) starting from Jinsi Tiraha To Moti Masjid Section 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Providing Concrete Lining in Kuthiran Tunnel for a length of 504 m of NH-544 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 REHABILITATION and Upgradation 2L PS for Gandhigram realignment from ch 24.200 to ch 27.250 on NH161A 40.00
40.00 ×

Cart totals

Subtotal 280.00
Total 280.00