Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Periodical Renewal between Ch183.00 Kmp to Ch190.00 on NH54 40.00
40.00 ×
Repair RnR Works of existing 2 (Two) Lane with Paved Shoulder from KM 80.930 to KM 96.400 on NH 29-Pkg-04 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgaradation/ Strengthening and 5Yrs Maintenance of the 2 Roads Package No.SLM-09/2022-23 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High level bridge on tributary of river Krishna from Thotlavalluru to Pamulalanka 40.00
40.00 ×
Building Construction of IPHL Building in the District of Mayurbhanj, Odisha 40.00
40.00 ×
Repair Restoration Repair of Potholes developed in NH- 208 from Ch. 150.000 km to Ch. 229.530 km 40.00
40.00 ×

Cart totals

Subtotal 240.00
Total 240.00