Cart

Product Price Quantity Subtotal  
Construction of 7 nos. of FOB at Km.378.620 Km.380.080, Km.395.330, Km.417.070, Km.420.320, Km.423.210 and Km.431.640 on Aligarh - Kanpur Section of NH-34 Construction of Foot Over Bridge at Km.130 640 of NH48 40.00
40.00 ×
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157.200 to Km 157.500 on NH-29 40.00
40.00 ×
Repair Patching of Potholes Jungle Clearance from Km 352 462 to 357 800 Selected reaches of NH 209 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Multi Purpose Indoor Stadium in V.L. Puram Municipal Corporation Site 30.00
30.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Construction of 2 lane paved shoulder in 4.122 Km and ROB on Km 70.682 to Km 106.526 on NH 150E 40.00
40.00 ×
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Beautification works of Highway Stretch from Km 199660 to 210350 of Agra Etawah NH19 40.00
40.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction of High Level Bridge at Km.7/6 of Marudadu - Veepankaranai Road 40.00
40.00 ×
Painting the sannathis, laying cut stone flooring, construction of compound wall of Arulmigu Agatheeswarar temple Painting the sannathis, laying cut stone flooring, construction of compound wall of Arulmigu Agatheeswarar temple 40.00
40.00 ×
Widening Widening from Single Lane to two lane with paved shoulder and strengthening of kutimekkipatti edaikaraipalam road km 0/0 1/8 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A 40.00
40.00 ×

Cart totals

Subtotal 390.00
Total 390.00