Cart

Product Price Quantity Subtotal  
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of N.C College for Science, Arts and Commerce Block at Jajpur Town 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J 4/6 Laning of Lucknow-Ayodhya-Gorakhpur section of NH-28 Package-II 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Strengthening, Improvements to the Government roads in Kurinjipady and Chidambaram-H- C and M Sub division 40.00
40.00 ×
STRENGTHENING Strengthening of NH 748 from Km. 118.00 to Km. 125.00 Khandepar to Safa Masjid 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of 6 lane flyover from Khapari ROB to Mihan Interchange and upgradation of existing 4 LPS road to 6 LPS 40.00
40.00 ×
Widening Widening Reconstruction and Upgradation to 2 lane with Paved Shoulder Four Lane configuration for the work of Sautada to Shirapur Section of NH 561 40.00
40.00 ×
Maintenance works Maintenance of Shahjahanpur-Bisalpur road from ch. 12.00 to 18.00 and ch. 21.00 to 39.00 on NH 731K 40.00
40.00 ×
Maintenance works PBMC for (i) NH-703A Section Gidderpindi to Makhu 60.860 to 76.150 with slip Road 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Vishranthigruva and PHC toilet in Govt School and Anganawadi Kendra 40.00
40.00 ×
Construction of Automated Multilevel Parking Rotary System at near National Hotel Tallital Nainital Construction of Automated Multilevel Parking Puzzle Rotary System at Magistrate Office Haridwar 40.00
40.00 ×

Cart totals

Subtotal 390.00
Total 390.00