Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction of road from Km 17.812 to Km 55.377 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Flyover at Km 400.700, at Km 410, at Km 472.750 of NH361 40.00
40.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction of Major High level bridges across PanvelMahad-Panjim road NH-66 30.00
30.00 ×
Construction of Bicycle Track along 4-lane Laddowal Bypass from km 0.000 to km 17.041 linking NH-95 with NH-1 Construction of Footpath in City Portion of Pilibhit on NH 731K under road safety works 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 One Time Improvement to Bypassed Stretches of NH214A(New NH216) from Km 57.700 to 63.441 40.00
40.00 ×

Cart totals

Subtotal 190.00
Total 190.00