Cart

Product Price Quantity Subtotal  
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J 4-laning of Indore to Raghav Garh section of NH-59 from MR-10 Junction on NH-3 Bypass 30.00
30.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of 6L Flyover at Km. 151.120 and 6L VUP at Km. 225.700 on Gurgaon Kotputli Jaipur section of NH48 40.00
40.00 ×
4-laning Development of 4-Laning of Jagtial Karimnagar Section of NH-563 from Ch.0.000 km (Existing chainage 90-500 on NH-63) 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction and Maintenance of road from Limber to Budrali Balance Work Stage 2 Package No JK03147 40.00
40.00 ×
Overlay on 6 lane Jaipur Kishangarh Highway from Km. 273.500 to Km. 363.885 section of NH 48 Development of 6-Lane Access Controlled Greenfield Highway from Chandrasekharapuram (Ch.228.000) to Polavaram 30.00
30.00 ×
Maintenance Annual maintenance of TTD Kalyanamandapam at Amarapuram 30.00
30.00 ×
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Periodic Renewal from Km 30.58 to Km 44.66 on NH-37(New)/NH-53 40.00
40.00 ×
Reconstruction of culverts at Km. 388.495, 396.407, 409.710 and 415.061 of NH26 Construction of 04 Culverts at Moolepadam (Km.337.830), Seminarpadi(Km.328.690) on NH 544 40.00
40.00 ×
UNDER PASS Construction of VUP at km 172.000 at the start of Beed Bypass on Yedshi Aurangabad section of NH-52 40.00
40.00 ×
civil Maintenance of Km.1.500 to Km 33.238 of NH-727BB 40.00
40.00 ×

Cart totals

Subtotal 370.00
Total 370.00