Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 IMPROVEMENTS TO SUBRAMANYA UDUPI SH 37 FROM KM 137.40 TO 139.40 IN KARKALA TALUK 30.00
30.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
road PBMC work of Rigid pavement of NH 752B Khilchipur- Jirapur section from Km 5.5 to Km 22.91 40.00
40.00 ×
road STMC of Porsa-Ater-Bhind section of NH 552 Ext from KM 285.750 to Km 343.800 40.00
40.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction 2Lane ROB in replacement of LCNo3E/SPL3 on Gudivada Machilipatnam railway sec at Km231.7 of NH165 30.00
30.00 ×
Bridge Reconstruction of Existing Major Bridge including Bridge approach from Km 114.000 to Km 277.500 of NH-33 40.00
40.00 ×

Cart totals

Subtotal 210.00
Total 210.00