Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation and Maintenance of Bairabi to Zamuang Road 40.00
40.00 ×
4 lane Development of 4 laning of Barasat-Barajaguli Section of NH-34 (New NH-12) from Km. 31.000 to Km. 48.679 40.00
40.00 ×
Maintenance works Short Term Improvement and Routine Maintenance between km 72/700 to km 74/700 of NH 183 40.00
40.00 ×
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Construction of Srinivasapura Bypass from existing Km 453 890 Design Ch 0 000 to existing Km 461 450 Design Ch 10 080 on NH 69 30.00
30.00 ×
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Development of Highway including Cycle Track for 2Lane Road of Potin to Pangin Section of NH-13 30.00
30.00 ×
Maintenance works PBMC from Ch.264.100 km to Km 305.000 km and from Km 330.000Km to Km 345.000 km (Total length 55.90 km) of NH-15 40.00
40.00 ×
4-laning 4-Laning of Jagtial Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch. 0.000 to Design Ch.28.000 40.00
40.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction 2Lane ROB in replacement of LCNo3E/SPL3 on Gudivada Machilipatnam railway sec at Km231.7 of NH165 30.00
30.00 ×
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Construction of Rewa Bypass as 4-lane with paved shoulder along with service road starts from the Ratahara Chowk to Chorhata Chowk of NH-30 40.00
40.00 ×

Cart totals

Subtotal 330.00
Total 330.00