Cart

Product Price Quantity Subtotal  
Resurfacing work with Bituminous Concrete in Km 165 (Mohkampur ROB) of Nh-72 (New NH-07) Providing BT to Nandavanapatti nadu theru in Nandavanapatti Panchayat 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation to 4 lane with Paved shoulder of Length 6.179 Km. Section of NH.753 30.00
30.00 ×
Repair Original repair on NH-346 Km, 3, 4, 11, 12, 15 to 17, 19, 21 to 25, 34 to 36, 86 to 95 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Const of 3 Lane River Bridge at Bhukhi Khadhi-Ch.176.420 and Amravati Khadi-Ch.202.845 40.00
40.00 ×
Widening Widening of Edamon-Kollam section from Km 0.000 to Km 52.200 Edamon to Kollam of NH-744 to 2-lane 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction of NH Crossing Bridge of 4 Lane at Km 80.998 of Polavaram Irrigation Project 40.00
40.00 ×
Maintenance works Short Term Maintenance from Km 133.150 to Km 154.000 on NH-72B 40.00
40.00 ×
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Construction of Bypass Road to Adoni town Connecting NH-167 from Km. 62/700 to 71/400 40.00
40.00 ×

Cart totals

Subtotal 310.00
Total 310.00