Cart

Product Price Quantity Subtotal  
Widening Widening to four 548B from Km 80 Near Murgundi to Km 140.2 near Chikkodi 40.00
40.00 ×
road Rehabilitation Upgradation of existing road to 2 Lane 4 Lane with paved shoulders NH 548B Design Chainage Km 289.300 to 342.890 40.00
40.00 ×
Maintenance works Major Maintenance of the Existing Highway Strengthening and Overlay from Km.32.700 to Km.38.000 of NH-32 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
Water proofing PROVIDING WATER PROOFING TREATMENT ON THE TERRACE OF MAIN SECURITY OFFICE 30.00
30.00 ×

Cart totals

Subtotal 180.00
Total 180.00