Cart

Product Price Quantity Subtotal  
Construction of balance concrete road connecting to North Gate flyover in JNPA Construction of CC Road and Box Drain in S.C Colony of Sollepura village 30.00
30.00 ×
Widening Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from Km 286.200 to Km 313.700 of NH 39 40.00
40.00 ×
Maintenance works Short Term Maintenance Contract of Khairipalli Talbeda Section of NH 53 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of New Anganwadi building at Kattur 30.00
30.00 ×
STRENGTHENING Strengthening of road from Km 459.930 to Km 465.200 of NH-02 30.00
30.00 ×
Overlay on 6 lane Jaipur Kishangarh Highway from Km. 273.500 to Km. 363.885 section of NH 48 Const. of 6lane Gf Highway starting from its Junc with NH4B (New NH348) near Pagote till its Junc on NH48 40.00
40.00 ×
Building Construction of libary Building at padirivedu village in Padirivedu Panchayat 40.00
80.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Improvements to Hubballi Devaragudihal MDR km 1.20 to 6.00 In Hubballi Taluk 30.00
30.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Rehabilitation and Up-Gradation of Wardha (Salod Hirapur) - Pulgaon Section of NH 347A from Km 0/000 to Km 24/887 40.00
40.00 ×
Repair Special Repair Works Civil at ESI Hospital Uluberia 30.00
30.00 ×

Cart totals

Subtotal 380.00
Total 380.00