Cart

Product Price Quantity Subtotal  
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Construction of 4 Lane Bypass to NH114A Connecting NH333 and NH133(Deoghar Bypass) frm design km 0.000 to design Km 49.000 30.00
30.00 ×
Repair Special Repair of Bridges Using UHPFRC at Km 140.200 and 171.455 in Jowai-Meghalaya Assam Border Section of NH-44 40.00
40.00 ×
road Short Term Maintenance Contract for Restoration of 4-laning of Dimapur-Kohima section on NH-29 from Km 126.600 to Km 126.800 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 40.00
40.00 ×
Repair Construction and Repairs to Art Gallery Building at Palace in Thanjavur Corporation in Thanjavur District 40.00
40.00 ×

Cart totals

Subtotal 190.00
Total 190.00