Cart

Product Price Quantity Subtotal  
Bridge Construction of 2 new ROBs in parallel in lieu of LC. 6 at Km 284 3.4 of NH 548D 30.00
30.00 ×
Maintenance works Maintenance Work to Kuhi Umred road NH247 in Km 51.420 to 70.200 in Nagpur District 30.00
30.00 ×
Consultancy Services for AE for Supervision of Chotahapjan Bogapani section in Digboi Bypass AE for Supervision of Jamugurihat to end of Biswanath Chariali Bypass 30.00
30.00 ×
Widening Widening and Strengthening of the road from NH-63 to Rangapet in Km 0/0 to 10/280 in Jagtial District 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Construction and Maintenance of road from Limber to Budrali Balance Work Stage 2 Package No JK03147 40.00
40.00 ×
Bridge Reconstruction of High Level Bridge at km 0-4 of Thengamputhur - Parakkai Kulakkarai Road 30.00
30.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of flyover on NH-62 at Km 213/600 Khimsar Village 40.00
40.00 ×

Cart totals

Subtotal 230.00
Total 230.00