Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Short Term measure for Road Safety in Koderma Meghatari section from km. 27.500 to km 47.500 of NH 31 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Anganwadi Building near Panchayat office in Elaiyaperumalnallur 30.00
30.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J SR to Govt Roads of Shencottai H and M Sub Division TNV87 30.00
30.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Providing Concrete Lining in Kuthiran Tunnel for a length of 504 m of NH-544 40.00
40.00 ×
Repair Repair and Painting Work of Plan House, Control Room and Old Barrack at Siul Complex, BSPS, Surangani 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Six Lane Flyover at the Junction of Por Itola (Ch 139.517), Kandari Chokdi (Ch 149.440) and Luvara Patiya 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Two Class Room in Elementry School at Thirupurambiyam Panchayat 30.00
30.00 ×
blackspot Rectification of accident prone location from Km 215.000 to Km 215.600 of NH 730 30.00
30.00 ×

Cart totals

Subtotal 270.00
Total 270.00