Cart

Product Price Quantity Subtotal  
Maintenance works STMC estimate from 250.948 to 262.948 265.598 to 271.968 and 272.168 to 274.738 of NH 20 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction of New Minor Bridge in Place of Old Narrow Bridge on Kadrama Khadi between KM 280/00 to 280/200 of NH 64 30.00
30.00 ×
blackspot Remedial Measures and improvement of Blackspot Blackspot ID KA 03 110 at Mayagondanahalli Village of Chainage Km 166.675 to Km 167.175 NH 73 40.00
40.00 ×
Building Upgradation of Staff Quarters TYPE 4 12 Nos D5 D16 AND TYPE 3 C1 C4 4 Nos at CSIR IHBT Palampur 40.00
40.00 ×

Cart totals

Subtotal 180.00
Total 180.00