|
Construction of High level Bridge across the river Thondiyar at Km 5_4 |
₹30.00 |
|
₹30.00 |
× |
|
Maintenance work from Km 61.500-67.380 Km 80.940-88.640 of NH69 |
₹30.00 |
|
₹30.00 |
× |
|
Operation and Maintenance of Hyderabad-Bangalore section-2 from Km 294.000 to Km 377.000 of NH 44 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of New Primary Health Centre building at Phirangipuram |
₹30.00 |
|
₹30.00 |
× |
|
Maintenance and Repair work from km 118.370 to Km.173.370 of NH-59 (Design length 55.40 Km) |
₹40.00 |
|
₹40.00 |
× |
|