Cart

Product Price Quantity Subtotal  
Overlay on 6 lane Jaipur Kishangarh Highway from Km. 273.500 to Km. 363.885 section of NH 48 Six laning of existing 4-lane section from Gonde (km. 439.038) to Pimpri Sado (km. 459.905) section of NH-848 40.00
40.00 ×
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Construction of Balrampur bypass with two lane 30.00
30.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction Of one Flyover at Km 2.735 and one Major bridge at Km 31.260 on NH 730 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o CONSTRUCTION OF ANGANWADI CENTER AT ADIDRAVIDAR COLONY AT W.NO.2 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Anganwadi building at Madhankoilpatti Village 30.00
30.00 ×
road Installation of Metal Beam Crash Barrier in Various location of Rajamunda Barkote section of NH 143 from km 287.200 to km. 337.185 40.00
40.00 ×
building Renovation Work of Town Hall in Ward No 07 (Part 1) 40.00
40.00 ×
road Four lanning of Mungiakami - Champaknagar section (NH-08) starting at km 421.850 (design chainage) and ending at km 447.300 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Academic Block, Toilet Block At- Hari Samant High School, Jajpur 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of 2 Class Room at Pon Pudupatty PUM School 30.00
30.00 ×
PROVIDING WALKING PALTFORM TO PARK IN PULICAT VILLAGE Repairs and maintenance of Mayor Sundarrao Park at Rukmani lakshmipathy Salai in Div-62 40.00
40.00 ×

Cart totals

Subtotal 400.00
Total 400.00