Cart

Product Price Quantity Subtotal  
Maintenance works Operation and Maintenance of 2 Lane with Paved shoulder from Km.71.200-Km.121.000 of NH-30 (NH-221) 40.00
40.00 ×
4 lane Develop to 4Laning of the descoped stretches from Km.115.342 to Km. 191.700 of NH34 40.00
40.00 ×
Maintenance works STMC at Section between Mokhada to Palghar Road on Sinner Ghoti Jawahar_Vikramgad- Manor Palghar Road NH-160A 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of 6-lane Flyover at Ainthapali junction on NH-53 30.00
30.00 ×
Repair Repairing of potholes patches on emergency basis on Tonk Sawai Madhopur section of NH 552 40.00
40.00 ×
STRENGTHENING Strengthening of Pavement(overlaying work) with DBM and BC of PALAHARA to PITIRI of NH 149 40.00
40.00 ×
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 Periodic Renewal of Trichy Bypass - Tovarankurichi - Madurai Section of NH-38 30.00
30.00 ×
4 lane Development of 4 laning of Barasat-Barajaguli Section of NH-34 (New NH-12) from Km. 31.000 to Km. 48.679 40.00
40.00 ×
UNDER PASS Construction of underpass at Km 539.400 (Vasapul) and FOB with ramp and Lift facility at Km 566.540 under 6-laning of NH-19 40.00
40.00 ×

Cart totals

Subtotal 340.00
Total 340.00