|
Resurfacing work with Bituminous Concrete in Km 165 (Mohkampur ROB) of Nh-72 (New NH-07) |
₹40.00 |
|
₹40.00 |
× |
|
Short Term Maintenance to NH 137A from km 000 to km 15 point 35 and from km 30 to km 45 |
₹40.00 |
|
₹40.00 |
× |
|
Design and Construction of 6 lane Standalone single span Grade Separated structure at Km 532 552 of NH 3 |
₹40.00 |
|
₹40.00 |
× |
|
Original repair on NH-346 Km, 3, 4, 11, 12, 15 to 17, 19, 21 to 25, 34 to 36, 86 to 95 |
₹40.00 |
|
₹40.00 |
× |
|
Work of Repairing Purna River Bridge near Viraval between Km. 363/00 to 363/400 of NH 64 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of ACHYUTHAM Block in place of the existing Sri Govindaraja Swamy Choultry (2nd nc) at Tirupati |
₹40.00 |
|
₹40.00 |
× |
|
Construction of ROB with approaches on NH 848 B at Udvada, Railway crossing LC No 87 at Km 181/18/20 |
₹40.00 |
|
₹40.00 |
× |
|
One time Improvement of existing road passing through Parola on Tarsod -Fagne section of NH-53 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of New OHT 10000 Liters at Nammiyambattu Santhaimedu Village |
₹40.00 |
|
₹40.00 |
× |
|
Civil works of Repair, Renovation and Allied works at TRWA |
₹50.00 |
|
₹50.00 |
× |
|