|
Const. of additional 3Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH922 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of proposed 2-lane ROB in lieu of existing level Crossing No.95 |
₹30.00 |
|
₹30.00 |
× |
|
Upgradation of Paravaai - Nannai Road Km. 0/0-3/500 |
₹30.00 |
|
₹30.00 |
× |
|
Strenghthning to NH927K Ranavav Bhanvad Khambhaliya road section Btn Km 0.0 to 21.5 and Km 27.9 to 30.9 |
₹40.00 |
|
₹40.00 |
× |
|
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole-Paradip Section of NH-53-Package-4 |
₹30.00 |
|
₹30.00 |
× |
|