Cart

Product Price Quantity Subtotal  
Resurfacing work with Bituminous Concrete in Km 165 (Mohkampur ROB) of Nh-72 (New NH-07) Resurfacing work with Bituminous Concrete in Km 165 (Mohkampur ROB) of Nh-72 (New NH-07) 40.00
40.00 ×
Widening Widening the left out existing 2L to 2L PS and Strengthening the selected stretches from Km 9/6 to Km 15/6 of NH 381A 40.00
40.00 ×
Maintenance works Maintenance work to NH543 in km 397.00 to 399/00 30.00
30.00 ×

Cart totals

Subtotal 110.00
Total 110.00