Cart

Product Price Quantity Subtotal  
Construction of 03 (three) no. RCC Bridges at 3.20 Km, 5.10 Km, 15.20 Km of PrataphKhali Khal Construction of Storm Water Drain, Culvert and Retaining Wall in Salem (H) (CandM) Sub Division (SLM-4) 40.00
40.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction Of Six Lane Flyover at the Junction Of Ch. 149.440 & Ch.186.640 for Rectification of Blackspots Of NH-8 40.00
40.00 ×
4 lane Construction of 4-lane Highway of Armoor Jagtiyal Mancherial Section of NH-63 from km. 65.000 to km. 93.700 Pkg-II 40.00
40.00 ×
Construction of ROB in lieu of LC No 51 Bengalure Mysore Railway Lane near Byrapatna of SH road Construction of two lane ROB in lieu of LCNo 13T at Railway km 70 35 on Secbad Wadi section 40.00
40.00 ×

Cart totals

Subtotal 160.00
Total 160.00