Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of P.K.road to Vallivaghai Joint road Km.0/0-1/350 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Maniyaramkuntu - Kootalumoodu road (via) Pathreswary Ammankoil road 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of New Public Distribution Centre at Selvavinayagapuram village 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Rehabilitation/Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 of NH727B 40.00
40.00 ×
Replacement of false ceiling flooring on and in front of the stage internal painting creating service platform externally at the auditorium Providing and fixing of wooden false ceiling in research scholar hostel building at IIIM 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Erode - Dharapuram road to Kaspapettai (via) Arasuperundu Nagar Km 0/0-1/6 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o CONSTRUCTION OF NEW PDS CENTRE AT THIRUMALAPURAM VILLAGE 30.00
30.00 ×
4 lane Maintenance of 4 lane elevated corridor in Deesa Town Km.565.850 to Km. 569.600 (Length 3.750 km) of NH-27 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of HL Major Bridge across Dahuka River at Km 226.377 of NH-57 40.00
40.00 ×

Cart totals

Subtotal 320.00
Total 320.00