Cart

Product Price Quantity Subtotal  
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Providing Concrete Lining in Kuthiran Tunnel for a length of 504 m of NH-544 40.00
40.00 ×
Maintenance works Short Term Maintenance Contract STMC for NH 167N and 752Kfor the year 2023 24 40.00
40.00 ×
Building Construction of Phase-II of Eklabya Model Residential School in Patana Block 40.00
40.00 ×
Building CONSTRUCTION OF SABHAMANDAP IN DURGA MATA MANDIR BHAVANI MAL MUKHED TQ. 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Restoration by filling of potholes to damaged surface of Km 0.00 to 0.500 Km.0.700 and in selected reaches on NH69 40.00
40.00 ×

Cart totals

Subtotal 200.00
Total 200.00