|
Improvements to Venkateshwar temple at Chandapur in Chincholi Taluka under MLA LAD |
₹30.00 |
|
₹30.00 |
× |
|
Reconstruction of minor bridge at KM 496/6 and 498/2 of NH 67 (Ghat Section) |
₹30.00 |
|
₹30.00 |
× |
|
Rehabilitation and Upgradation of existing road to two Lane with paved shoulder configuration from Km 22/300 to 58/635 of NH167B |
₹30.00 |
|
₹30.00 |
× |
|
CONSTRUCTION OF COMPOUND WALL AT MADHANAN KUPPAM BURIAL GROUND |
₹30.00 |
|
₹30.00 |
× |
|
Routine Maintenance and Repairs of Anantapuramu Guntur road of NH544D from Km 8/8 to Km 213/0 |
₹30.00 |
|
₹30.00 |
× |
|
Restoration Rehabilitation work of Birendra Sasmal Setu over river Kangsabati at Ch. 118.70 Km. of NH-60 |
₹30.00 |
|
₹30.00 |
× |
|
Widening from Km 0/0-0/6 and Strengthening from Km 0/0 -9/0 in Krishnagiri - Kuppam Road NH-219 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of anganwadi-A center building at Hoovinamadu village |
₹30.00 |
|
₹30.00 |
× |
|
PR to NH 565 from Km 261/700 to 267/200 ( Kanigiri Town Bypassed Stretch) in Prakasam District |
₹30.00 |
|
₹30.00 |
× |
|
Construction of General Toilet block in Central Bus Station at Bidar |
₹30.00 |
|
₹30.00 |
× |
|
Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 of Paniyala-Barodameo ICR |
₹30.00 |
|
₹30.00 |
× |
|
Widening to 2 and 4 lane with PS of Left out portion of NH 30 from existing Ch. 125.285 to 115.485 |
₹30.00 |
|
₹30.00 |
× |
|
Widening to two lane with paved shoulders of Hiriyur-Huliyar Section of NH 150A |
₹30.00 |
|
₹30.00 |
× |
|