Cart

Product Price Quantity Subtotal  
8 Lane Rehabilitation and Up gradation from 4 to 8 laning of NH-53 from Km.0.00 to Km.18.00-Package-1 30.00
30.00 ×
blackspot Rectification of 10 nos. Black Spots of NH 512 Kadighat and Kalitala , Gangarampur BusStand 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×
Repair Repair and Painting Work of Plan House, Control Room and Old Barrack at Siul Complex, BSPS, Surangani 40.00
40.00 ×
Construction of Service roads at Mangalampalam, Panniyankara, Kodakara and Potta in the stretch of Walayar-Angamali Section of NH-544 Construction of Service Road from Ch 2.800 to Ch 4.200 of NH69 30.00
30.00 ×

Cart totals

Subtotal 170.00
Total 170.00