|
Development of 6 Lane Access Controlled Greenfield Highway from Nallacheruvu palli(Ch.96.300)to Yerragudipadu(Ch 129.000)of Bengaluru Vijayawada Economic Corridor |
₹30.00 |
|
₹30.00 |
× |
|
Construction of Two Lane with Paved Shoulders from Km 0.000 to Km 41.920 of NH 930P |
₹40.00 |
|
₹40.00 |
× |
|
Four laning of Bellary to Byrapura Section of NH150A from Km.253.600 to Km.308.550 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 |
₹30.00 |
|
₹30.00 |
× |
|
Construction of 4laning with paved shoulder from Hassan to Adihalli EC20 |
₹30.00 |
|
₹30.00 |
× |
|