Cart

Product Price Quantity Subtotal  
blackspot Rectification of accident prone Black spot of NH 26 from Km 72.00 to 130.280 Km 40.00
40.00 ×
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Construction of 4 laning Greenfield corridor from Ch. 0.000 to Ch 74.432 of NH-119A Package-1 40.00
40.00 ×
Bridge Construction of ROB at LC 115B in Manmad-Chalisgaon Section of NH 753J 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Rehabilitation/Up-gradation to 2 lane with PS configur. from Km.0.000 to Km.7.800 of NH727B 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Sri Venkatappayya Shresti dormitory building 30.00
30.00 ×

Cart totals

Subtotal 180.00
Total 180.00