Cart

Product Price Quantity Subtotal  
4-laning Access Controlled Highway of 4 Lane with Paved Shoulders from design Ch. 26.000 to design Ch 55.800(Package 2) 40.00
40.00 ×
Maintenance works STMC of NH 51 from km 145.000 to km 148.282 (Length 3.282 km) 40.00
40.00 ×
building tender Construction of toilet block gents and ladies to Govt. Higher Primary School at Belakota village 30.00
30.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of additional 2-lane High Level Bridge across the river Cheyyar at Km 119/8 of NH-234 30.00
30.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Construction 2Lane ROB in replacement of LCNo3E/SPL3 on Gudivada Machilipatnam railway sec at Km231.7 of NH165 30.00
30.00 ×

Cart totals

Subtotal 170.00
Total 170.00