Cart

Product Price Quantity Subtotal  
Maintenance works STMC estimate from 250.948 to 262.948 265.598 to 271.968 and 272.168 to 274.738 of NH 20 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River 30.00
30.00 ×

Cart totals

Subtotal 70.00
Total 70.00