Cart

Product Price Quantity Subtotal  
Construction of High level bridge across Mallin Nalla in km 90.460 of NH-130B Construction of High level bridge across Mallin Nalla in km 90.460 of NH-130B 40.00
40.00 ×
4-laning Four Laning of Phagwara to Rupnagar section of NH-344A from Km 0.000 to 80.820 40.00
40.00 ×
Maintenance works Performance Based Maintenance Contract to NH-115 from km 8.352 (Talap) to km 16.642 km (Dhola) in Tinsukia District 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Up-gradation to two-four lane with paved shoulder configuration Akabeda to Kasturmeta in km 65.600 to 70.453 - 4.760 km of NH-130D (part-3) 40.00
40.00 ×
Widening Widening of existing 2 lane to four lane road from km. 176.50 to km. 178.00 of NH 76 30.00
30.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o CONSTRUCTION OF NEW PDS CENTRE AT SANGANAPERI VILLAGE 30.00
30.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction Of one Flyover at Km 2.735 and one Major bridge at Km 31.260 on NH 730 30.00
30.00 ×

Cart totals

Subtotal 250.00
Total 250.00