Cart

Product Price Quantity Subtotal  
4-laning Const of 4lane access controlled GF Highway from Kereya to Latra sec of NH 143D starting from design CH.28.953 to CH 103.000 40.00
40.00 ×
Widening Widening to two lane with paved shoulders from Km 0/000 to Km 79/300 of Kalwakurthy - Kollapur section of NH-167K 30.00
30.00 ×
building tender Construction of Health SubCentre at Adanuru Village in Holalkere Taluk. 30.00
30.00 ×
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Construction of Two laning with Hard shoulder road of Ram-Mandir toArrowa section of NH-113 30.00
30.00 ×
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Flyover at Km. 355.78 on NH-50 near Kharge Petrol Pump to cross over the Gulbarga-Sedam Road 30.00
30.00 ×

Cart totals

Subtotal 160.00
Total 160.00