|
Construction of Approaches to Newly Constructed Major Bridge in Km 26th of NH-218 On Gawai River |
₹40.00 |
|
₹40.00 |
× |
|
Construction of secondary access road (0.75 Km) for emergencies and VIPs exit for Noida International Airport YEIDA |
₹40.00 |
|
₹40.00 |
× |
|
Strengthening from Km 163/000-166/400 of NH 209 on Item rate Basis contract |
₹30.00 |
|
₹30.00 |
× |
|
Strengthening / Overlaying and Maintenance of the existing bituminous surface from Km 0.000 to Km 38.000 of NH-383 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of ROB at km 198 of NH-114A at Sapha (LC No. 20SPL/E) |
₹40.00 |
|
₹40.00 |
× |
|
Construction of foot over Bridge at Ispur on km 7/300 on NH-503A under Annual Plan 2021-22 |
₹30.00 |
|
₹30.00 |
× |
|