|
Repair and rehabilitation of existing distressed Bridges of NH 14 under Package4 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of road from km 87.13 to Km 121.541 (package-3) of Taliha to Tato stretch of NH-913 |
₹40.00 |
|
₹40.00 |
× |
|
STMC to NH 62 from km 64th to km 91st (L 28.00 km) for the year 2024-25 |
₹40.00 |
|
₹40.00 |
× |
|
Short term maintenance of NH-22 (newNH-05) between Km 200/000 to 208/700 |
₹40.00 |
|
₹40.00 |
× |
|
PR to bypassed stretch in Pedha Kodapgal from Km 104 330 Km 106 860 |
₹30.00 |
|
₹30.00 |
× |
|