|
Strengthening of Pavement(overlaying work) with DBM and BC of PALAHARA to PITIRI of NH 149 |
₹40.00 |
|
₹40.00 |
× |
|
Painting the sannathis, laying cut stone flooring, construction of compound wall of Arulmigu Agatheeswarar temple |
₹40.00 |
|
₹40.00 |
× |
|
Construction of FOB near Gudugolanu village at design Km.1023.520 of six laning of Gudugolanu to Kalaparru section of NH 16 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of High Level Bridge Across Arasalaru River at Km. 0/4 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of 6lane Greenfield Varanasi-Ranchi-Kolkata Highway-Pkg13 |
₹30.00 |
|
₹30.00 |
× |
|