|
Construction of Underpass at Km. 06.853 along with approaches on Panikoili Rimuli section of NH 215 |
₹30.00 |
|
₹30.00 |
× |
|
Improvement and Routine Maintenance including incident management of stretch from start of Patiala Bypass to start of Sangrur Bypass section of NH-64 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of Srinivasapura Bypass from existing Km 453 890 Design Ch 0 000 to existing Km 461 450 Design Ch 10 080 on NH 69 |
₹30.00 |
|
₹30.00 |
× |
|
Const. of additional 3Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH922 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of ROB at Km 116 of NH-99 (new NH-22) at Chandwa (LC No. 12A/T) |
₹40.00 |
|
₹40.00 |
× |
|
Construction of bridge on Sankeshwar Sangam SH-44 at Km 93.74, 95.74 and 97.04 in Mudhol taluka |
₹30.00 |
|
₹30.00 |
× |
|