Cart

Product Price Quantity Subtotal  
STRENGTHENING Strengthening and improvement of existing 4 Lane Divided Carriageway from Km.27.700 to Km. 75.500 of NH-27 40.00
40.00 ×
Construction of RCC tunnel with earth rubber cushion after reclaiming the damaged NH 05 from km 347 250 to 347 510 Providing Concrete Lining in Kuthiran Tunnel for a length of 504 m of NH-544 40.00
40.00 ×

Cart totals

Subtotal 80.00
Total 80.00