Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of P.K.road to Nochimalai Road Km.0/0-2/300 40.00
40.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Upgradation of Parapatty to Sandiyur Road Km 0/0-2/475 30.00
30.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Four laning of Ambala-Kaithal from km 0.000 (Ambala) to km 50.860 (Pehowa) 30.00
30.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of Long Span Bridge Across the Bhadra river near Kolumage in Mudigere Taluk 30.00
30.00 ×
Maintenance works Maintenance works and activities on 2-lane with paved shoulder stretch from km 15.525 to km 62.880 of NH 167 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High Level Bridge across Cauvery River at Km 315.6 to 316.2 of Chennai Trichy Dindugal Road SHU9 40.00
40.00 ×
Re Construction of 3 lane Minor Bridge at Km. 320.052 on RHS on Puintola Tangi section of NH 16 Reconstruction of minor bridge at KM 496/6 and 498/2 of NH 67 (Ghat Section) 30.00
30.00 ×
Building Proposed Construction of ArulmiguPalaniandavar Arts and Science College for Women 40.00
40.00 ×
Maintenance works Strengthening and 5 Year Maintenance of M. Pothanathi - Ellinganaickanpatti Road in Kallikudi Block 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J SR to Govt Roads of Tenkasi H C and M Sub DivisionTNV86 30.00
30.00 ×
4-laning Up-gradation to two lane - four lane with paved shoulder configuration of Akabeda to Kasturmeta in km 65.600 to 70.453 - 4.760 km of NH-130D (PART-3) 40.00
40.00 ×

Cart totals

Subtotal 390.00
Total 390.00