|
Construction of underpass at Km 539.400 (Vasapul) and FOB with ramp and Lift facility at Km 566.540 under 6-laning of NH-19 |
₹40.00 |
|
₹40.00 |
× |
|
Rehabilitation of AKG Fly over in Kozhikode district |
₹40.00 |
|
₹40.00 |
× |
|
Construction and Maintenance of road from Limber to Budrali Balance Work Stage 2 Package No JK03147 |
₹40.00 |
|
₹40.00 |
× |
|
Operation and Maintenance of Allahabad Bypass from Km 158.00 to Km 242.708 |
₹30.00 |
|
₹30.00 |
× |
|
Widening from IL to DL and Strengthening of Derisanamcope Surulacode road TNV 76 |
₹40.00 |
|
₹40.00 |
× |
|
Construction of High Level Bridge Across Arasalaru River at Km. 0/4 |
₹40.00 |
|
₹40.00 |
× |
|
BITUMINOUS REPAIRS TO GONDIA TO TIRORA SECTION OF NH 753 IN KM. 46.000 TO KM. 46.660 |
₹40.00 |
|
₹40.00 |
× |
|
Re Construction of High Level Bridge across Kannanar river at Km 22/2 |
₹40.00 |
|
₹40.00 |
× |
|
PBMC for (i) NH-703A Section Gidderpindi to Makhu 60.860 to 76.150 with slip Road |
₹40.00 |
|
₹40.00 |
× |
|
Widening to 2 lane with paved shoulders from 0.00 to 32.970 of NH 353B |
₹40.00 |
|
₹40.00 |
× |
|