Cart

Product Price Quantity Subtotal  
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High level Bridge across the river Thondiyar at Km 5_4 30.00
30.00 ×
Building Construction of Phase II of Eklabya Model Residential School in Udala Block 40.00
40.00 ×
Repair Ordinary repair works of Kumarghat to Kailashahar section of NH208 from existing bypassed Total length 1.400 km 40.00
40.00 ×
Widening Widening to 2L PS from Km.0.00 to Km.37.850 of NH 766C 30.00
30.00 ×
Application of water proof paint on the terrace of HRD block at SRP Building, CSIR-CFTRI, Mysuru Painting and repair works of Divisional Office Inspection House NH and Divisional Store 40.00
40.00 ×
Repair Renovation works in Arulmigu Sanjivirayar Temple at Iyyangar Kulam Village 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Sri Doddamma Jaladurgamma Devala Bhavan in Hosamane Badavane of Shivamogga City 30.00
30.00 ×

Cart totals

Subtotal 250.00
Total 250.00