Cart

Product Price Quantity Subtotal  
Const of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B Construction of Six Lane Flyover at the Junction of Por Itola, Kandari Chokdi and Luvara Patiya 30.00
30.00 ×
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Rehabilitation and Upgradation of Two Lane road with Paved Shoulders length in Kinkheda and Linga Kotwal Village NH 461B from KM. 25.900 to 28.775 40.00
40.00 ×
STRENGTHENING Strengthening and improvement of existing 4 Lane Divided Carriageway from Km.27.700 to Km. 75.500 of NH-27 40.00
40.00 ×
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A 4Laning of Chowka to Kaimaha near MP/UP Border sec NH34 form Design Ch145.000 to Design Ch197.266 40.00
40.00 ×
Overlay on 6 lane Jaipur Kishangarh Highway from Km. 273.500 to Km. 363.885 section of NH 48 Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 on NH-66 40.00
40.00 ×
Construction of balance work NH Morshi Chandurbazar Achalpur NH 353J Rehabilitation and Up gradation of Pathri Selu Deogaon Phata from Borgavhan to Selu Design Ch Km.47 900 to Km 62 800 40.00
40.00 ×
Maintenance works Short Term Maintenance from Km 133.150 to Km 154.000 on NH-72B 40.00
40.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Const of 3L River Bridge at Bhukhi Khadi Ch 176.420 And Amravati Khadi Ch 202.845 40.00
40.00 ×
Bridge Construction of Minor Bridge works including Reconstruction of Culvert in Govt. Roads in respect of Alangudi (TRY-61) 40.00
40.00 ×

Cart totals

Subtotal 350.00
Total 350.00