Cart

Product Price Quantity Subtotal  
Rehabilitation and upgradation to 2 lane_4 lane standards of N.H. section Bhokar to Sarsam Budruk Km.0.00 to 33.00 of N.H. 161A Construction of balance works of two number of interchanges at Jaipur Ring Road from Tonk road to Ajmer road section 40.00
40.00 ×
STRENGTHENING Strengthening and improvement of existing 4Lane Divided Carriageway from Km. 27.700 to Km.75.500 of NH27 40.00
40.00 ×
Providing Precast units between Berth and Back up area in Dock area of VPA Providing Precast units between Berth and Back up area in Dock area of VPA 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o Construction of Vishranthigruva and PHC toilet in Govt School and Anganawadi Kendra 40.00
40.00 ×
STRENGTHENING Strengthening at Km 9/0-12/6 of Unjini - Variyankaval road including Reconstruction of Box culvert 40.00
40.00 ×
Construction of 7 nos. of FOB at Km.378.620 Km.380.080, Km.395.330, Km.417.070, Km.420.320, Km.423.210 and Km.431.640 on Aligarh - Kanpur Section of NH-34 Construction of Foot Over Bridge at km 162 at Mussoorie on NH-707A 40.00
40.00 ×
Painting the sannathis, laying cut stone flooring, construction of compound wall of Arulmigu Agatheeswarar temple Re-Construction of Sri Bhaktanjaneya Swamy Temple 30.00
30.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High Level Bridge across Cauvery River at Km 315.6 to 316.2 of Chennai Trichy Dindugal Road SHU9 40.00
40.00 ×

Cart totals

Subtotal 310.00
Total 310.00