Cart

Product Price Quantity Subtotal  
Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 Restoration by filling of potholes to damaged surface of Km 0.00 to 0.500 Km.0.700 and in selected reaches on NH69 40.00
40.00 ×
Construction of Waiting shed at Samathuva Burial ground in Narippadi H/o CONSTRUCTION OF A NEW ADMINISTRATIVE BLOCK TO GOVT POLYTECHNIC COLLEGE 30.00
30.00 ×
Reconstruction of Ambuttanpotti Santhigram bridge across Chaliyar river Construction of High Level Bridge at Km 3/2 of the Road branching from Km 29/8 across Gadilam River 40.00
40.00 ×

Cart totals

Subtotal 110.00
Total 110.00